TY - GEN
T1 - Modelo de gestion de produccion basado en herramientas Lean Manufacturing y BPM para incrementar la rentabilidad en Pymes del Sector Plastico
AU - Fernandez-Albujar, Christian
AU - Rosa-Arizaga, Leslie La
AU - Flores-Perez, Alberto
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2022
Y1 - 2022
N2 - In Peru, the plastic sector has acquired a solid position in the market, as a result, that sector must face needs related to the level of service and level of productivity; in order to optimize the rate of profitability. Due to the above, it is of the utmost importance to structure each of the processes, the projection of demand, the administration of resources and the supervision of set-up times. One of the important points to consider regarding what has already been mentioned is the management of resources and maintenance in the machines, for which it is proposed to consider the use of tools such as Business Process Management (BPM), Total Productive Maintenance (TPM) y Single Minute Exchange of Die (SMED), approval of suppliers and standardization in order to reduce the delivery time of orders and increase the low productivity evidenced due to the poor management of productive resources.
AB - In Peru, the plastic sector has acquired a solid position in the market, as a result, that sector must face needs related to the level of service and level of productivity; in order to optimize the rate of profitability. Due to the above, it is of the utmost importance to structure each of the processes, the projection of demand, the administration of resources and the supervision of set-up times. One of the important points to consider regarding what has already been mentioned is the management of resources and maintenance in the machines, for which it is proposed to consider the use of tools such as Business Process Management (BPM), Total Productive Maintenance (TPM) y Single Minute Exchange of Die (SMED), approval of suppliers and standardization in order to reduce the delivery time of orders and increase the low productivity evidenced due to the poor management of productive resources.
KW - Business Process Management
KW - Lean Manufacturing
KW - plastic sector
KW - productivity
KW - time set up
UR - https://hdl.handle.net/20.500.12724/17961
UR - http://www.scopus.com/inward/record.url?scp=85149405400&partnerID=8YFLogxK
U2 - 10.1109/IESTEC54539.2022.00018
DO - 10.1109/IESTEC54539.2022.00018
M3 - Articulo (Contribución a conferencia)
AN - SCOPUS:85149405400
T3 - Proceedings - 2022 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
SP - 61
EP - 67
BT - Proceedings - 2022 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
Y2 - 19 October 2022 through 21 October 2022
ER -