TY - GEN
T1 - Increased Productivity through a Production Model Based on Lean Manufacturing and SLP Tools in Small Furniture Manufacturing Workshops
AU - Kawakami-Arevalo, Sayuri
AU - Veliz-Torres, Martha Sofia
AU - Quiroz-Flores, Juan Carlos
AU - Noriega-Aranibar, Maria Teresa
N1 - Publisher Copyright:
© 2022 ACM.
PY - 2022/9/27
Y1 - 2022/9/27
N2 - The furniture industry has developed globally with exponential growth in recent years. In Peru, it is one of the key sectors in the productive transformation chain that is growing the most. However, these companies are mostly microenterprises and present various challenges such as the lack of quality standards, the high need for labor, the lack of qualified workers, limitations in technology, among others, which leads to low productivity and performance. That said, the main objective of this research is to increase the productivity of a Peruvian SME workshop dedicated to the manufacture of melamine furniture on a small scale. For this purpose, a model composed of the tools Systematic Layout Planning (SLP), 5'S and Standard Work (SW) was proposed and executed through a pilot plan and simulation. As a result, there was an increase in productivity by 11.82%, an increase in production by 50% and a reduction in production time from 398 min to 330.67 min.
AB - The furniture industry has developed globally with exponential growth in recent years. In Peru, it is one of the key sectors in the productive transformation chain that is growing the most. However, these companies are mostly microenterprises and present various challenges such as the lack of quality standards, the high need for labor, the lack of qualified workers, limitations in technology, among others, which leads to low productivity and performance. That said, the main objective of this research is to increase the productivity of a Peruvian SME workshop dedicated to the manufacture of melamine furniture on a small scale. For this purpose, a model composed of the tools Systematic Layout Planning (SLP), 5'S and Standard Work (SW) was proposed and executed through a pilot plan and simulation. As a result, there was an increase in productivity by 11.82%, an increase in production by 50% and a reduction in production time from 398 min to 330.67 min.
KW - 5S
KW - Lean Manufacturing
KW - Productivity
KW - small melamine furniture
KW - Standard Work
KW - systematic layout planning
UR - https://hdl.handle.net/20.500.12724/17955
UR - http://www.scopus.com/inward/record.url?scp=85147416028&partnerID=8YFLogxK
U2 - 10.1145/3568834.3568873
DO - 10.1145/3568834.3568873
M3 - Articulo (Contribución a conferencia)
AN - SCOPUS:85147416028
T3 - ACM International Conference Proceeding Series
SP - 419
EP - 425
BT - 2022 8th International Conference on Industrial and Business Engineering, ICIBE 2022
PB - Association for Computing Machinery
T2 - 8th International Conference on Industrial and Business Engineering, ICIBE 2022
Y2 - 27 September 2022 through 29 September 2022
ER -