In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-meter span bridge located in Lima, Peru. The objective was to reduce structural rebars' assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved.
| Idioma original | Inglés |
|---|---|
| Páginas | 1008-1019 |
| Número de páginas | 12 |
| DOI | |
| Estado | Publicada - 2022 |
| Evento | 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 - Edmonton, Canadá Duración: 25 jul. 2022 → 31 jul. 2022 |
Conferencia
| Conferencia | 30th Annual Conference of the International Group for Lean Construction, IGLC 2022 |
|---|---|
| País/Territorio | Canadá |
| Ciudad | Edmonton |
| Período | 25/07/22 → 31/07/22 |
Huella
Profundice en los temas de investigación de 'PREFABRICATED REINFORCEMENT IN CONSTRUCTION USING VDC: CASE STUDY OVALO MONITOR BRIDGE'. En conjunto forman una huella única.Citar esto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver