TY - GEN
T1 - Production Management Model Based on Lean Manufacturing and SPL to Increase Productivity in Clothing SMEs
AU - Liberato-Arenas, Anderson
AU - Collao-Diaz, Martin
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2022
Y1 - 2022
N2 - Micro and small businesses currently have a low performance in productivity indicators in the clothing industry. For this reason, a management model in production is presented, whose main objective is to increase the productivity of operators in a (SME) textile sector. In response, it is proposed to design a model in the implementation of lean manufacturing tools, TPM and SPL whose approach is based on change management, using a sequence in the methodology to obtain better results. In phase one, a diagnosis of the company will be made using a Street Mapping (VSM) value. In phase 2, work areas are ordered and redesigned through the adoption of the 5S and SLP and then total productive maintenance (TPM) will be executed with work standardization. Finally, in phase 3, the indicators of the proposed model will be reassessed to validate and corroborate the effectiveness of the implementation of the integrative model.
AB - Micro and small businesses currently have a low performance in productivity indicators in the clothing industry. For this reason, a management model in production is presented, whose main objective is to increase the productivity of operators in a (SME) textile sector. In response, it is proposed to design a model in the implementation of lean manufacturing tools, TPM and SPL whose approach is based on change management, using a sequence in the methodology to obtain better results. In phase one, a diagnosis of the company will be made using a Street Mapping (VSM) value. In phase 2, work areas are ordered and redesigned through the adoption of the 5S and SLP and then total productive maintenance (TPM) will be executed with work standardization. Finally, in phase 3, the indicators of the proposed model will be reassessed to validate and corroborate the effectiveness of the implementation of the integrative model.
KW - 5S
KW - Productivity
KW - SLP
KW - SW
KW - TPM
UR - https://hdl.handle.net/20.500.12724/17963
UR - http://www.scopus.com/inward/record.url?scp=85149381007&partnerID=8YFLogxK
U2 - 10.1109/IESTEC54539.2022.00022
DO - 10.1109/IESTEC54539.2022.00022
M3 - Articulo (Contribución a conferencia)
AN - SCOPUS:85149381007
T3 - Proceedings - 2022 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
SP - 87
EP - 91
BT - Proceedings - 2022 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 8th International Engineering, Sciences and Technology Conference, IESTEC 2022
Y2 - 19 October 2022 through 21 October 2022
ER -