T1 - Reducing Customer Complaints in Air Conditioning Installation Services through Lean and MRP Tools
T2 - 5th Conference on Production Systems and Logistics, CPSL 2023
AU - Aguilar-Cevallos, Silvana
AU - Aguilar-Cevallos, Yersson
AU - Quiroz-Flores, Juan Carlos
AU - García-Lopez, Yvan J.
N1 - Publisher Copyright:
© 2023, Publish-Ing in cooperation with TIB - Leibniz Information Centre for Science and Technology University Library. All rights reserved.
PY - 2023
Y1 - 2023
N2 - In Latin America, the business services sector is constantly searching for continuous improvement to improve the performance of service operations and service quality. However, merchandise availability must be guaranteed to prevent stockouts and preserve high customer satisfaction. Therefore, managing a warehouse inside a service organization is challenging. In this way, a model for improvement was created to address the issues raised above, combining Lean Service tools such as ABC, 5S, and standardization of work with a Material Requirements Plan (MRP) to reduce the claims rate, which is currently 60 percent owing to ineffective management of the tool ordering and installation processes. After implementing the pilot plan and the simulation in the Arena software, a significant variation in the claims rate was evidenced by reducing it to 30%. This study contributes to the validation of lean tools in the air conditioning service industry and will continue to contribute to future managers with similar processes.
AB - In Latin America, the business services sector is constantly searching for continuous improvement to improve the performance of service operations and service quality. However, merchandise availability must be guaranteed to prevent stockouts and preserve high customer satisfaction. Therefore, managing a warehouse inside a service organization is challenging. In this way, a model for improvement was created to address the issues raised above, combining Lean Service tools such as ABC, 5S, and standardization of work with a Material Requirements Plan (MRP) to reduce the claims rate, which is currently 60 percent owing to ineffective management of the tool ordering and installation processes. After implementing the pilot plan and the simulation in the Arena software, a significant variation in the claims rate was evidenced by reducing it to 30%. This study contributes to the validation of lean tools in the air conditioning service industry and will continue to contribute to future managers with similar processes.
KW - 5S
KW - ABC classification
KW - air conditioning installation
KW - claims
KW - customer satisfaction
KW - Lean Warehousing
KW - Material Requirements Planning (MRP)
KW - Standardization Work
KW - Warehouse management
UR - http://www.scopus.com/inward/record.url?scp=85187976902&partnerID=8YFLogxK
U2 - 10.15488/15319
DO - 10.15488/15319
M3 - Artículo de la conferencia
AN - SCOPUS:85187976902
SN - 2701-6277
SP - 860
EP - 873
JO - Proceedings of the Conference on Production Systems and Logistics
JF - Proceedings of the Conference on Production Systems and Logistics
Y2 - 14 November 2023 through 17 November 2023
ER -